Introducing Tata Daewoo’s SPV line-up
Mobile tank lorry (5kg)
Maximum payload in the same classification considering high efficiency in transportation
Best convenience and safety work with a system allowing the groundwork and stable parts
Application for hazardous materials installation license
After delivery, it is necessary to receive the hazardous materials installation license (Inspection proof of completion) from a fire station together with a vehicle registration.
- Attached document when applying for hazardous materials installation license
- Tank safety performance test report
- Tank capacity verification certificate
- Fueling verification certificate
- Structural facility statement
- Depot layout (Drawing)
- Vehicle registration certificate